Back to Home

Civil Projects Database

A searchable catalog of all **90+ infrastructure projects** constructed and supervised—including office buildings, 40 box culverts, girder bridges, solar lights, and roadworks.

Filtered
93
Total logged
93
SDF District Office BuildingOffice Buildings
Zila Parishad Road, Tangail Sadar, Tangail

SDF District Office Building

Construction of a climate-resilient 3-story concrete district administrative building for the Social Development Foundation.

Year: 2024Case Study
SDF Community Cluster OfficeOffice Buildings
Ghatail Upazila, Tangail

SDF Community Cluster Office

A modern 2-story office building functioning as a central coordination hub for local community clusters.

Year: 2023Case Study
SDF Training Center & HostelOffice Buildings
Mymensingh Sadar, Mymensingh

SDF Training Center & Hostel

3-story educational training facility with administrative wings and housing accommodation.

Year: 2022Case Study
Gram Samity Community CenterOffice Buildings
Char Haripur, Mymensingh

Gram Samity Community Center

Eco-friendly single-story building for rural community empowerment.

Year: 2021Case Study
Regional SDF Resource CenterOffice Buildings
Kurigram Sadar, Kurigram

Regional SDF Resource Center

A climate-resilient 2-story office and disaster shelter building.

Year: 2023Case Study
RCC Box Culvert #1 - Digar VillageCulverts
Digar Village, Ghatail, Tangail

RCC Box Culvert #1 - Digar Village

Construction of a 1.5m x 1.5m RCC Box Culvert to improve rural drainage and connectivity.

Year: 2020Case Study
RCC Box Culvert #2 - Char GobindapurCulverts
Char Gobindapur, Mymensingh Sadar, Mymensingh

RCC Box Culvert #2 - Char Gobindapur

Construction of a 2.0m x 2.0m RCC Box Culvert to improve rural drainage and connectivity.

Year: 2021Case Study
RCC Box Culvert #3 - Shimultola VillageCulverts
Shimultola Village, Kurigram Sadar, Kurigram

RCC Box Culvert #3 - Shimultola Village

Construction of a 3.0m x 3.0m RCC Box Culvert to improve rural drainage and connectivity.

Year: 2022Case Study
RCC Box Culvert #4 - Char ShambhuganjCulverts
Char Shambhuganj, Sherpur Sadar, Sherpur

RCC Box Culvert #4 - Char Shambhuganj

Construction of a 4.0m x 4.0m Double-Vent Box Culvert to improve rural drainage and connectivity.

Year: 2023Case Study
RCC Box Culvert #5 - Baniachong UpazilaCulverts
Baniachong Upazila, Habiganj

RCC Box Culvert #5 - Baniachong Upazila

Construction of a 2.5m x 2.5m RCC Box Culvert to improve rural drainage and connectivity.

Year: 2024Case Study
RCC Box Culvert #6 - Pirgachha UpazilaCulverts
Pirgachha Upazila, Rangpur

RCC Box Culvert #6 - Pirgachha Upazila

Construction of a 3.5m x 3.5m Double-Vent Box Culvert to improve rural drainage and connectivity.

Year: 2025Case Study
RCC Box Culvert #7 - Phulbari UpazilaCulverts
Phulbari Upazila, Dinajpur

RCC Box Culvert #7 - Phulbari Upazila

Construction of a 1.5m x 1.5m RCC Box Culvert to improve rural drainage and connectivity.

Year: 2020Case Study
RCC Box Culvert #8 - Kamarkhanda UpazilaCulverts
Kamarkhanda Upazila, Sirajganj

RCC Box Culvert #8 - Kamarkhanda Upazila

Construction of a 2.0m x 2.0m RCC Box Culvert to improve rural drainage and connectivity.

Year: 2021Case Study
RCC Box Culvert #9 - Sariakandi UpazilaCulverts
Sariakandi Upazila, Bogura

RCC Box Culvert #9 - Sariakandi Upazila

Construction of a 3.0m x 3.0m RCC Box Culvert to improve rural drainage and connectivity.

Year: 2022Case Study
RCC Box Culvert #10 - Naria UpazilaCulverts
Naria Upazila, Shariatpur

RCC Box Culvert #10 - Naria Upazila

Construction of a 4.0m x 4.0m Double-Vent Box Culvert to improve rural drainage and connectivity.

Year: 2023Case Study
RCC Box Culvert #11 - Digar VillageCulverts
Digar Village, Ghatail, Tangail

RCC Box Culvert #11 - Digar Village

Construction of a 2.5m x 2.5m RCC Box Culvert to improve rural drainage and connectivity.

Year: 2024Case Study
RCC Box Culvert #12 - Char GobindapurCulverts
Char Gobindapur, Mymensingh Sadar, Mymensingh

RCC Box Culvert #12 - Char Gobindapur

Construction of a 3.5m x 3.5m Double-Vent Box Culvert to improve rural drainage and connectivity.

Year: 2025Case Study
RCC Box Culvert #13 - Shimultola VillageCulverts
Shimultola Village, Kurigram Sadar, Kurigram

RCC Box Culvert #13 - Shimultola Village

Construction of a 1.5m x 1.5m RCC Box Culvert to improve rural drainage and connectivity.

Year: 2020Case Study
RCC Box Culvert #14 - Char ShambhuganjCulverts
Char Shambhuganj, Sherpur Sadar, Sherpur

RCC Box Culvert #14 - Char Shambhuganj

Construction of a 2.0m x 2.0m RCC Box Culvert to improve rural drainage and connectivity.

Year: 2021Case Study
RCC Box Culvert #15 - Baniachong UpazilaCulverts
Baniachong Upazila, Habiganj

RCC Box Culvert #15 - Baniachong Upazila

Construction of a 3.0m x 3.0m RCC Box Culvert to improve rural drainage and connectivity.

Year: 2022Case Study
RCC Box Culvert #16 - Pirgachha UpazilaCulverts
Pirgachha Upazila, Rangpur

RCC Box Culvert #16 - Pirgachha Upazila

Construction of a 4.0m x 4.0m Double-Vent Box Culvert to improve rural drainage and connectivity.

Year: 2023Case Study
RCC Box Culvert #17 - Phulbari UpazilaCulverts
Phulbari Upazila, Dinajpur

RCC Box Culvert #17 - Phulbari Upazila

Construction of a 2.5m x 2.5m RCC Box Culvert to improve rural drainage and connectivity.

Year: 2024Case Study
RCC Box Culvert #18 - Kamarkhanda UpazilaCulverts
Kamarkhanda Upazila, Sirajganj

RCC Box Culvert #18 - Kamarkhanda Upazila

Construction of a 3.5m x 3.5m Double-Vent Box Culvert to improve rural drainage and connectivity.

Year: 2025Case Study
RCC Box Culvert #19 - Sariakandi UpazilaCulverts
Sariakandi Upazila, Bogura

RCC Box Culvert #19 - Sariakandi Upazila

Construction of a 1.5m x 1.5m RCC Box Culvert to improve rural drainage and connectivity.

Year: 2020Case Study
RCC Box Culvert #20 - Naria UpazilaCulverts
Naria Upazila, Shariatpur

RCC Box Culvert #20 - Naria Upazila

Construction of a 2.0m x 2.0m RCC Box Culvert to improve rural drainage and connectivity.

Year: 2021Case Study
RCC Box Culvert #21 - Digar VillageCulverts
Digar Village, Ghatail, Tangail

RCC Box Culvert #21 - Digar Village

Construction of a 3.0m x 3.0m RCC Box Culvert to improve rural drainage and connectivity.

Year: 2022Case Study
RCC Box Culvert #22 - Char GobindapurCulverts
Char Gobindapur, Mymensingh Sadar, Mymensingh

RCC Box Culvert #22 - Char Gobindapur

Construction of a 4.0m x 4.0m Double-Vent Box Culvert to improve rural drainage and connectivity.

Year: 2023Case Study
RCC Box Culvert #23 - Shimultola VillageCulverts
Shimultola Village, Kurigram Sadar, Kurigram

RCC Box Culvert #23 - Shimultola Village

Construction of a 2.5m x 2.5m RCC Box Culvert to improve rural drainage and connectivity.

Year: 2024Case Study
RCC Box Culvert #24 - Char ShambhuganjCulverts
Char Shambhuganj, Sherpur Sadar, Sherpur

RCC Box Culvert #24 - Char Shambhuganj

Construction of a 3.5m x 3.5m Double-Vent Box Culvert to improve rural drainage and connectivity.

Year: 2025Case Study
RCC Box Culvert #25 - Baniachong UpazilaCulverts
Baniachong Upazila, Habiganj

RCC Box Culvert #25 - Baniachong Upazila

Construction of a 1.5m x 1.5m RCC Box Culvert to improve rural drainage and connectivity.

Year: 2020Case Study
RCC Box Culvert #26 - Pirgachha UpazilaCulverts
Pirgachha Upazila, Rangpur

RCC Box Culvert #26 - Pirgachha Upazila

Construction of a 2.0m x 2.0m RCC Box Culvert to improve rural drainage and connectivity.

Year: 2021Case Study
RCC Box Culvert #27 - Phulbari UpazilaCulverts
Phulbari Upazila, Dinajpur

RCC Box Culvert #27 - Phulbari Upazila

Construction of a 3.0m x 3.0m RCC Box Culvert to improve rural drainage and connectivity.

Year: 2022Case Study
RCC Box Culvert #28 - Kamarkhanda UpazilaCulverts
Kamarkhanda Upazila, Sirajganj

RCC Box Culvert #28 - Kamarkhanda Upazila

Construction of a 4.0m x 4.0m Double-Vent Box Culvert to improve rural drainage and connectivity.

Year: 2023Case Study
RCC Box Culvert #29 - Sariakandi UpazilaCulverts
Sariakandi Upazila, Bogura

RCC Box Culvert #29 - Sariakandi Upazila

Construction of a 2.5m x 2.5m RCC Box Culvert to improve rural drainage and connectivity.

Year: 2024Case Study
RCC Box Culvert #30 - Naria UpazilaCulverts
Naria Upazila, Shariatpur

RCC Box Culvert #30 - Naria Upazila

Construction of a 3.5m x 3.5m Double-Vent Box Culvert to improve rural drainage and connectivity.

Year: 2025Case Study
RCC Box Culvert #31 - Digar VillageCulverts
Digar Village, Ghatail, Tangail

RCC Box Culvert #31 - Digar Village

Construction of a 1.5m x 1.5m RCC Box Culvert to improve rural drainage and connectivity.

Year: 2020Case Study
RCC Box Culvert #32 - Char GobindapurCulverts
Char Gobindapur, Mymensingh Sadar, Mymensingh

RCC Box Culvert #32 - Char Gobindapur

Construction of a 2.0m x 2.0m RCC Box Culvert to improve rural drainage and connectivity.

Year: 2021Case Study
RCC Box Culvert #33 - Shimultola VillageCulverts
Shimultola Village, Kurigram Sadar, Kurigram

RCC Box Culvert #33 - Shimultola Village

Construction of a 3.0m x 3.0m RCC Box Culvert to improve rural drainage and connectivity.

Year: 2022Case Study
RCC Box Culvert #34 - Char ShambhuganjCulverts
Char Shambhuganj, Sherpur Sadar, Sherpur

RCC Box Culvert #34 - Char Shambhuganj

Construction of a 4.0m x 4.0m Double-Vent Box Culvert to improve rural drainage and connectivity.

Year: 2023Case Study
RCC Box Culvert #35 - Baniachong UpazilaCulverts
Baniachong Upazila, Habiganj

RCC Box Culvert #35 - Baniachong Upazila

Construction of a 2.5m x 2.5m RCC Box Culvert to improve rural drainage and connectivity.

Year: 2024Case Study
RCC Box Culvert #36 - Pirgachha UpazilaCulverts
Pirgachha Upazila, Rangpur

RCC Box Culvert #36 - Pirgachha Upazila

Construction of a 3.5m x 3.5m Double-Vent Box Culvert to improve rural drainage and connectivity.

Year: 2025Case Study
RCC Box Culvert #37 - Phulbari UpazilaCulverts
Phulbari Upazila, Dinajpur

RCC Box Culvert #37 - Phulbari Upazila

Construction of a 1.5m x 1.5m RCC Box Culvert to improve rural drainage and connectivity.

Year: 2020Case Study
RCC Box Culvert #38 - Kamarkhanda UpazilaCulverts
Kamarkhanda Upazila, Sirajganj

RCC Box Culvert #38 - Kamarkhanda Upazila

Construction of a 2.0m x 2.0m RCC Box Culvert to improve rural drainage and connectivity.

Year: 2021Case Study
RCC Box Culvert #39 - Sariakandi UpazilaCulverts
Sariakandi Upazila, Bogura

RCC Box Culvert #39 - Sariakandi Upazila

Construction of a 3.0m x 3.0m RCC Box Culvert to improve rural drainage and connectivity.

Year: 2022Case Study
RCC Box Culvert #40 - Naria UpazilaCulverts
Naria Upazila, Shariatpur

RCC Box Culvert #40 - Naria Upazila

Construction of a 4.0m x 4.0m Double-Vent Box Culvert to improve rural drainage and connectivity.

Year: 2023Case Study
30m RCC Girder BridgeBridges
Louhajang River Canal, Tangail Sadar, Tangail

30m RCC Girder Bridge

A 30-meter high-impact reinforced concrete girder bridge connecting five local farming villages.

Year: 2024Case Study
15m RCC Slab BridgeBridges
Char Haripur, Mymensingh

15m RCC Slab Bridge

15-meter single-span RCC slab bridge over a tidal agricultural canal.

Year: 2023Case Study
24m RCC Girder BridgeBridges
Nageshwari Upazila, Kurigram

24m RCC Girder Bridge

Climate-resilient 24-meter bridge designed for high flash-flood discharge.

Year: 2022Case Study
12m RCC Box BridgeBridges
Sherpur Upazila, Sherpur

12m RCC Box Bridge

Supervised high-load capacity 12-meter single-cell box bridge.

Year: 2021Case Study
18m Pre-stressed Concrete BridgeBridges
Jamalpur Sadar, Jamalpur

18m Pre-stressed Concrete Bridge

Modern 18-meter pre-stressed girder bridge replacing a high-maintenance iron bridge.

Year: 2024Case Study
20m Segmental RCC BridgeBridges
Baniachong Upazila, Habiganj

20m Segmental RCC Bridge

Rural canal bridge designed for high water currents in Haor wetland regions.

Year: 2023Case Study
Solar Street Light Installation #1 - Digar Village BazaarSolar Lights
Digar Village Bazaar, Ghatail, Tangail

Solar Street Light Installation #1 - Digar Village Bazaar

Installation of 10 modern solar-powered LED street lights in Digar.

Year: 2021Case Study
Solar Street Light Installation #2 - Char Gobindapur Union MarketSolar Lights
Char Gobindapur Union Market, Mymensingh

Solar Street Light Installation #2 - Char Gobindapur Union Market

Installation of 15 modern solar-powered LED street lights in Char.

Year: 2022Case Study
Solar Street Light Installation #3 - Kurigram Sadar Health Complex RoadSolar Lights
Kurigram Sadar Health Complex Road, Kurigram

Solar Street Light Installation #3 - Kurigram Sadar Health Complex Road

Installation of 12 modern solar-powered LED street lights in Kurigram.

Year: 2023Case Study
Solar Street Light Installation #4 - Char Shambhuganj High School AreaSolar Lights
Char Shambhuganj High School Area, Sherpur

Solar Street Light Installation #4 - Char Shambhuganj High School Area

Installation of 8 modern solar-powered LED street lights in Char.

Year: 2024Case Study
Solar Street Light Installation #5 - Habiganj Rural Cluster VillageSolar Lights
Habiganj Rural Cluster Village, Habiganj

Solar Street Light Installation #5 - Habiganj Rural Cluster Village

Installation of 20 modern solar-powered LED street lights in Habiganj.

Year: 2021Case Study
Solar Street Light Installation #6 - Pirgachha Community Center PlazaSolar Lights
Pirgachha Community Center Plaza, Rangpur

Solar Street Light Installation #6 - Pirgachha Community Center Plaza

Installation of 25 modern solar-powered LED street lights in Pirgachha.

Year: 2022Case Study
Solar Street Light Installation #7 - Phulbari Upazila Sadar CrossingSolar Lights
Phulbari Upazila Sadar Crossing, Dinajpur

Solar Street Light Installation #7 - Phulbari Upazila Sadar Crossing

Installation of 14 modern solar-powered LED street lights in Phulbari.

Year: 2023Case Study
Solar Street Light Installation #8 - Kamarkhanda Village Market RoadSolar Lights
Kamarkhanda Village Market Road, Sirajganj

Solar Street Light Installation #8 - Kamarkhanda Village Market Road

Installation of 18 modern solar-powered LED street lights in Kamarkhanda.

Year: 2024Case Study
Solar Street Light Installation #9 - Digar Village BazaarSolar Lights
Digar Village Bazaar, Ghatail, Tangail

Solar Street Light Installation #9 - Digar Village Bazaar

Installation of 10 modern solar-powered LED street lights in Digar.

Year: 2021Case Study
Solar Street Light Installation #10 - Char Gobindapur Union MarketSolar Lights
Char Gobindapur Union Market, Mymensingh

Solar Street Light Installation #10 - Char Gobindapur Union Market

Installation of 15 modern solar-powered LED street lights in Char.

Year: 2022Case Study
Solar Street Light Installation #11 - Kurigram Sadar Health Complex RoadSolar Lights
Kurigram Sadar Health Complex Road, Kurigram

Solar Street Light Installation #11 - Kurigram Sadar Health Complex Road

Installation of 12 modern solar-powered LED street lights in Kurigram.

Year: 2023Case Study
Solar Street Light Installation #12 - Char Shambhuganj High School AreaSolar Lights
Char Shambhuganj High School Area, Sherpur

Solar Street Light Installation #12 - Char Shambhuganj High School Area

Installation of 8 modern solar-powered LED street lights in Char.

Year: 2024Case Study
Solar Street Light Installation #13 - Habiganj Rural Cluster VillageSolar Lights
Habiganj Rural Cluster Village, Habiganj

Solar Street Light Installation #13 - Habiganj Rural Cluster Village

Installation of 20 modern solar-powered LED street lights in Habiganj.

Year: 2021Case Study
Solar Street Light Installation #14 - Pirgachha Community Center PlazaSolar Lights
Pirgachha Community Center Plaza, Rangpur

Solar Street Light Installation #14 - Pirgachha Community Center Plaza

Installation of 25 modern solar-powered LED street lights in Pirgachha.

Year: 2022Case Study
Solar Street Light Installation #15 - Phulbari Upazila Sadar CrossingSolar Lights
Phulbari Upazila Sadar Crossing, Dinajpur

Solar Street Light Installation #15 - Phulbari Upazila Sadar Crossing

Installation of 14 modern solar-powered LED street lights in Phulbari.

Year: 2023Case Study
Solar Street Light Installation #16 - Kamarkhanda Village Market RoadSolar Lights
Kamarkhanda Village Market Road, Sirajganj

Solar Street Light Installation #16 - Kamarkhanda Village Market Road

Installation of 18 modern solar-powered LED street lights in Kamarkhanda.

Year: 2024Case Study
Solar Street Light Installation #17 - Digar Village BazaarSolar Lights
Digar Village Bazaar, Ghatail, Tangail

Solar Street Light Installation #17 - Digar Village Bazaar

Installation of 10 modern solar-powered LED street lights in Digar.

Year: 2021Case Study
Solar Street Light Installation #18 - Char Gobindapur Union MarketSolar Lights
Char Gobindapur Union Market, Mymensingh

Solar Street Light Installation #18 - Char Gobindapur Union Market

Installation of 15 modern solar-powered LED street lights in Char.

Year: 2022Case Study
Solar Street Light Installation #19 - Kurigram Sadar Health Complex RoadSolar Lights
Kurigram Sadar Health Complex Road, Kurigram

Solar Street Light Installation #19 - Kurigram Sadar Health Complex Road

Installation of 12 modern solar-powered LED street lights in Kurigram.

Year: 2023Case Study
Solar Street Light Installation #20 - Char Shambhuganj High School AreaSolar Lights
Char Shambhuganj High School Area, Sherpur

Solar Street Light Installation #20 - Char Shambhuganj High School Area

Installation of 8 modern solar-powered LED street lights in Char.

Year: 2024Case Study
Solar Street Light Installation #21 - Habiganj Rural Cluster VillageSolar Lights
Habiganj Rural Cluster Village, Habiganj

Solar Street Light Installation #21 - Habiganj Rural Cluster Village

Installation of 20 modern solar-powered LED street lights in Habiganj.

Year: 2021Case Study
Solar Street Light Installation #22 - Pirgachha Community Center PlazaSolar Lights
Pirgachha Community Center Plaza, Rangpur

Solar Street Light Installation #22 - Pirgachha Community Center Plaza

Installation of 25 modern solar-powered LED street lights in Pirgachha.

Year: 2022Case Study
Solar Street Light Installation #23 - Phulbari Upazila Sadar CrossingSolar Lights
Phulbari Upazila Sadar Crossing, Dinajpur

Solar Street Light Installation #23 - Phulbari Upazila Sadar Crossing

Installation of 14 modern solar-powered LED street lights in Phulbari.

Year: 2023Case Study
Solar Street Light Installation #24 - Kamarkhanda Village Market RoadSolar Lights
Kamarkhanda Village Market Road, Sirajganj

Solar Street Light Installation #24 - Kamarkhanda Village Market Road

Installation of 18 modern solar-powered LED street lights in Kamarkhanda.

Year: 2024Case Study
Solar Street Light Installation #25 - Digar Village BazaarSolar Lights
Digar Village Bazaar, Ghatail, Tangail

Solar Street Light Installation #25 - Digar Village Bazaar

Installation of 10 modern solar-powered LED street lights in Digar.

Year: 2021Case Study
Solar Street Light Installation #26 - Char Gobindapur Union MarketSolar Lights
Char Gobindapur Union Market, Mymensingh

Solar Street Light Installation #26 - Char Gobindapur Union Market

Installation of 15 modern solar-powered LED street lights in Char.

Year: 2022Case Study
Solar Street Light Installation #27 - Kurigram Sadar Health Complex RoadSolar Lights
Kurigram Sadar Health Complex Road, Kurigram

Solar Street Light Installation #27 - Kurigram Sadar Health Complex Road

Installation of 12 modern solar-powered LED street lights in Kurigram.

Year: 2023Case Study
Solar Street Light Installation #28 - Char Shambhuganj High School AreaSolar Lights
Char Shambhuganj High School Area, Sherpur

Solar Street Light Installation #28 - Char Shambhuganj High School Area

Installation of 8 modern solar-powered LED street lights in Char.

Year: 2024Case Study
Solar Street Light Installation #29 - Habiganj Rural Cluster VillageSolar Lights
Habiganj Rural Cluster Village, Habiganj

Solar Street Light Installation #29 - Habiganj Rural Cluster Village

Installation of 20 modern solar-powered LED street lights in Habiganj.

Year: 2021Case Study
Solar Street Light Installation #30 - Pirgachha Community Center PlazaSolar Lights
Pirgachha Community Center Plaza, Rangpur

Solar Street Light Installation #30 - Pirgachha Community Center Plaza

Installation of 25 modern solar-powered LED street lights in Pirgachha.

Year: 2022Case Study
Solar Street Light Installation #31 - Phulbari Upazila Sadar CrossingSolar Lights
Phulbari Upazila Sadar Crossing, Dinajpur

Solar Street Light Installation #31 - Phulbari Upazila Sadar Crossing

Installation of 14 modern solar-powered LED street lights in Phulbari.

Year: 2023Case Study
Solar Street Light Installation #32 - Kamarkhanda Village Market RoadSolar Lights
Kamarkhanda Village Market Road, Sirajganj

Solar Street Light Installation #32 - Kamarkhanda Village Market Road

Installation of 18 modern solar-powered LED street lights in Kamarkhanda.

Year: 2024Case Study
Rural Road Development #1 - Chandpur Village RoadEarth Work / Roads
Chandpur Village Road, Sherpur Sadar, Sherpur

Rural Road Development #1 - Chandpur Village Road

Soil compaction, embankment filling, and HBB (Herring Bone Bond) brick soling of a 1.2 km roadway.

Year: 2021Case Study
Rural Road Development #2 - Dighar Union Connectivity HighwayEarth Work / Roads
Dighar Union Connectivity Highway, Tangail

Rural Road Development #2 - Dighar Union Connectivity Highway

Soil compaction, embankment filling, and HBB (Herring Bone Bond) brick soling of a 2.0 km roadway.

Year: 2022Case Study
Rural Road Development #3 - Char Haripur Market Link RoadEarth Work / Roads
Char Haripur Market Link Road, Mymensingh

Rural Road Development #3 - Char Haripur Market Link Road

Soil compaction, embankment filling, and HBB (Herring Bone Bond) brick soling of a 1.5 km roadway.

Year: 2023Case Study
Rural Road Development #4 - Nageshwari Cluster RoadwayEarth Work / Roads
Nageshwari Cluster Roadway, Kurigram

Rural Road Development #4 - Nageshwari Cluster Roadway

Soil compaction, embankment filling, and HBB (Herring Bone Bond) brick soling of a 0.8 km roadway.

Year: 2024Case Study
Rural Road Development #5 - Sariakandi Flood Protection EmbankmentEarth Work / Roads
Sariakandi Flood Protection Embankment, Bogura

Rural Road Development #5 - Sariakandi Flood Protection Embankment

Soil compaction, embankment filling, and HBB (Herring Bone Bond) brick soling of a 2.5 km roadway.

Year: 2021Case Study
Rural Road Development #6 - Kamarkhanda Village Access RoadEarth Work / Roads
Kamarkhanda Village Access Road, Sirajganj

Rural Road Development #6 - Kamarkhanda Village Access Road

Soil compaction, embankment filling, and HBB (Herring Bone Bond) brick soling of a 1.8 km roadway.

Year: 2022Case Study
Rural Road Development #7 - Baniachong Canal Embankment RoadEarth Work / Roads
Baniachong Canal Embankment Road, Habiganj

Rural Road Development #7 - Baniachong Canal Embankment Road

Soil compaction, embankment filling, and HBB (Herring Bone Bond) brick soling of a 3.0 km roadway.

Year: 2023Case Study
Rural Road Development #8 - Pirgachha Farming Collector RoadEarth Work / Roads
Pirgachha Farming Collector Road, Rangpur

Rural Road Development #8 - Pirgachha Farming Collector Road

Soil compaction, embankment filling, and HBB (Herring Bone Bond) brick soling of a 1.1 km roadway.

Year: 2024Case Study
Rural Road Development #9 - Ghatail Rural Bypass RoadEarth Work / Roads
Ghatail Rural Bypass Road, Tangail

Rural Road Development #9 - Ghatail Rural Bypass Road

Soil compaction, embankment filling, and HBB (Herring Bone Bond) brick soling of a 2.2 km roadway.

Year: 2021Case Study
Rural Road Development #10 - Jamalpur Village Connection RoadEarth Work / Roads
Jamalpur Village Connection Road, Jamalpur

Rural Road Development #10 - Jamalpur Village Connection Road

Soil compaction, embankment filling, and HBB (Herring Bone Bond) brick soling of a 1.4 km roadway.

Year: 2022Case Study