Office Buildings

Regional SDF Resource Center

Kurigram Sadar, KurigramCompleted: 2023
Project Budget
18,500,000 BDT
Regional SDF Resource Center
Regional SDF Resource Center detail view
Quality Control

Designed and executed under full structural engineer compliance, utilizing slump consistencies, cylindrical testing, and grade validation.

Project Overview & Scope

Designed with an elevated ground floor to remain operational during annual river flooding. Serves as a district emergency hub for northern SDF projects.

“This subproject is part of the community-driven micro-financing initiative co-financed by local villagers and the Social Development Foundation. It aims to empower community communication, bypass flood blockages, and promote district connectivity.”

Engineering Execution & QA/QC Methodology

Detailed On-site Operations Log:

Spearheaded piling site mapping, concrete grade-30 casting, pile cap construction, and elevated grade beam structural integrity verification.

Technical Specs

Structure Type
RCC Frame on Stilts / Pillars
Total Floor Area
6,800 sq. ft.
Foundation
Deep Piling
Estimated Cost
18,500,000 BDT
Quality Verified
Ayman Tanzil, B.Sc. CE

Need a Similar Construction?

Consult on site surveying, foundation calculations, concrete volume estimation, or cost budgets.

Inquire For Consult