Bridges

18m Pre-stressed Concrete Bridge

Jamalpur Sadar, JamalpurCompleted: 2024
Project Budget
9,200,000 BDT
18m Pre-stressed Concrete Bridge
18m Pre-stressed Concrete Bridge detail view
Quality Control

Designed and executed under full structural engineer compliance, utilizing slump consistencies, cylindrical testing, and grade validation.

Project Overview & Scope

Engineered for high longevity, reducing structural maintenance costs by over 80% compared to traditional structural steel frame bridges in rural waterways.

“This subproject is part of the community-driven micro-financing initiative co-financed by local villagers and the Social Development Foundation. It aims to empower community communication, bypass flood blockages, and promote district connectivity.”

Engineering Execution & QA/QC Methodology

Detailed On-site Operations Log:

Reviewed tensioning logs for longitudinal high-strength steel strands. Inspected concrete compression strength and supervised deck pouring.

Technical Specs

Structure Type
Pre-stressed Girder & RC Slab
Total Span Length
18 meters
Estimated Cost
9,200,000 BDT
Quality Verified
Ayman Tanzil, B.Sc. CE

Need a Similar Construction?

Consult on site surveying, foundation calculations, concrete volume estimation, or cost budgets.

Inquire For Consult