15m RCC Slab Bridge


Designed and executed under full structural engineer compliance, utilizing slump consistencies, cylindrical testing, and grade validation.
Project Overview & Scope
An essential rural link bridge ensuring year-round communication for children going to primary schools and villagers visiting community health centers.
“This subproject is part of the community-driven micro-financing initiative co-financed by local villagers and the Social Development Foundation. It aims to empower community communication, bypass flood blockages, and promote district connectivity.”
Engineering Execution & QA/QC Methodology
Detailed On-site Operations Log:
Executed water bypass channel construction. Supervised pile-less high-bearing capacity abutment wall casting. Supervised deck reinforcement tying, concrete casting with vibrators, and wing-wall backfilling with graded river sand.
Technical Specs
Need a Similar Construction?
Consult on site surveying, foundation calculations, concrete volume estimation, or cost budgets.
Inquire For Consult