Bridges

24m RCC Girder Bridge

Nageshwari Upazila, KurigramCompleted: 2022
Project Budget
11,500,000 BDT
24m RCC Girder Bridge
24m RCC Girder Bridge detail view
Quality Control

Designed and executed under full structural engineer compliance, utilizing slump consistencies, cylindrical testing, and grade validation.

Project Overview & Scope

Engineered specifically to survive northern flash floods. Ground clearance was raised by 1.8 meters above highest flood levels (HFL) recorded in the last 50 years.

“This subproject is part of the community-driven micro-financing initiative co-financed by local villagers and the Social Development Foundation. It aims to empower community communication, bypass flood blockages, and promote district connectivity.”

Engineering Execution & QA/QC Methodology

Detailed On-site Operations Log:

Monitored piling excavation depth, structural steel cage alignment, underwater tremie pipe concrete pouring, pier cap construction, and rubber pad bearing positioning.

Technical Specs

Structure Type
RCC Girder Bridge
Total Span Length
24 meters
Clearance Above HFL
2.2 meters
Foundation
Deep Cast-in-situ concrete piles
Estimated Cost
11,500,000 BDT
Quality Verified
Ayman Tanzil, B.Sc. CE

Need a Similar Construction?

Consult on site surveying, foundation calculations, concrete volume estimation, or cost budgets.

Inquire For Consult