24m RCC Girder Bridge


Designed and executed under full structural engineer compliance, utilizing slump consistencies, cylindrical testing, and grade validation.
Project Overview & Scope
Engineered specifically to survive northern flash floods. Ground clearance was raised by 1.8 meters above highest flood levels (HFL) recorded in the last 50 years.
“This subproject is part of the community-driven micro-financing initiative co-financed by local villagers and the Social Development Foundation. It aims to empower community communication, bypass flood blockages, and promote district connectivity.”
Engineering Execution & QA/QC Methodology
Detailed On-site Operations Log:
Monitored piling excavation depth, structural steel cage alignment, underwater tremie pipe concrete pouring, pier cap construction, and rubber pad bearing positioning.
Technical Specs
Need a Similar Construction?
Consult on site surveying, foundation calculations, concrete volume estimation, or cost budgets.
Inquire For Consult