20m Segmental RCC Bridge


Designed and executed under full structural engineer compliance, utilizing slump consistencies, cylindrical testing, and grade validation.
Project Overview & Scope
Designed with heavy protective stone-pitching (rip-rap) at the abutments to prevent heavy scour during seasonal Haor water surges.
“This subproject is part of the community-driven micro-financing initiative co-financed by local villagers and the Social Development Foundation. It aims to empower community communication, bypass flood blockages, and promote district connectivity.”
Engineering Execution & QA/QC Methodology
Detailed On-site Operations Log:
Directed stone boulder placement around abutments, monitored piling integrity, and verified structural concrete curing levels.
Technical Specs